Mechanical Inspection
Mechanical Codes:
- 2006 International Mechanical Code
- 2006 International Fuel Gas Code
- 2006 International Residential Code; parts V and VI
Mechanical Fees:
Mechanical permit fees are established by Resolution.
Licensing Requirements:
HVAC licensing is administered by the State of Idaho:
Permits:
Mechanical permits are required anytime a mechanical appliance or system is installed, altered, enlarged, replaced, repaired, removed or converted, with few exceptions. This includes water heaters, fire places, furnaces and air conditioners. The code allows for emergency mechanical repairs and replacements prior to permit application, as long as a permit is applied for on the next working day. Please contact our office with any questions.
Permit Application Information:
- Residential Mechanical Permit Application Requirements
- Commercial Mechanical Permit Application Requirements
Please stop by the building department's city offices during business hours to obtain your permit application.
Inspections:
Greg McBride serves as the chief mechanical inspector for the City of Ammon. The mechanical codes prescribe three possible inspection times:
- Underground Inspection
- Rough-in Inspection
- Final Inspection
For questions regarding inspections please review the applicable code section 107.
Greg may be reached at gmcbride@ci.ammon.id.us or (208) 612-4024.
For detailed instructions on scheduling an inspection - click here.
Mechanical Inspection Checklists:
Additional Information:
State of Idaho:
Residential Construction:
- ACCA is the accepted residential HVAC organization
- Residential Energy Code
- Are heat load calculations required by code?
- Residential heat load and duct design software
- ACCA Manual J design information
- ACCA Manual D design information
- Residential design checklist
- The Value of 'commissioning' your HVAC system